Oakbrook Commerce

What exactly do we handle?

Five services, from the first factory shortlist to the container at your dock. Each one below lists what is included, what is not, what you receive and how long it usually takes.

Kitchen with wooden cabinets, marble counters and brass fixtures
01

Can you find factories that make my part?

Yes. We shortlist 3–5 hardware factories in China, Vietnam or Taiwan that already make parts close to your spec, and put their quotes side by side.

Includes

  • +Review of your spec: material, finish, dimensions, load rating, packaging
  • +Factory screening by product range, export history and sample quality
  • +Written quotes requested against the same spec and quantity

Not included

  • –On-site factory audits (available through a third-party audit firm at cost)
  • –Tooling design or custom mold engineering

You receive

A written comparison sheet: unit price FOB, MOQ, lead time and payment terms per factory, with our notes.

Typical timing

About 10 business days from a complete spec.

02

Who handles samples and revisions?

We do. Factories ship samples to the address you choose, we collect your feedback on color, feel and dimensions, and follow up with the factory until you approve a sample in writing.

Includes

  • +Sample requests to shortlisted factories
  • +Consolidated feedback sent back in the factory's terms
  • +Revision tracking until written approval of the golden sample

Not included

  • –Courier and sample charges, which are passed through at actual cost
  • –Lab testing to ANSI/BHMA A156.9 (quoted separately by a test lab if you need it)

You receive

An approved reference sample, kept on your side and matched to the factory's retained sample.

Typical timing

Typically 2–4 weeks per sample round, including courier time.

03

How do I know production is on track?

You get one written summary every week from your coordinator, and third-party inspectors check the goods before they ship.

Hands measuring a part with a digital caliper

Includes

  • +Weekly summary: status, risks, next dates
  • +Pre-production check and pre-shipment inspection by a third-party inspection firm
  • +Inspection report forwarded to you; goods released only after your sign-off

Not included

  • –Paying the factory on your behalf (you pay the factory directly)
  • –Inspection fees, which are passed through at actual cost

You receive

Weekly summaries and inspection reports with photos, measurements and AQL results.

Typical timing

Runs for the length of production, commonly 30–45 days after deposit.

04

Will the shipping documents match my order?

We check them before they go to your broker. Commercial invoice, packing list, bill of lading and country of origin are compared with your purchase order line by quantity and value.

Includes

  • +Document check against the PO and the inspection report
  • +Booking coordination with your forwarder or one we recommend
  • +ISF data and entry documents passed to your licensed customs broker

Not included

  • –Filing customs entries or ISF (done by your licensed customs broker)
  • –Carrying freight (done by forwarders and carriers)

You receive

A checked document set and a booking confirmation with vessel and ETA.

Typical timing

During the final production week and the week of loading.

05

What happens when the container reaches Los Angeles or Long Beach?

We coordinate the last leg. A drayage carrier takes the container to your warehouse, or to a third-party warehouse for receiving count and split shipments.

Includes

  • +Drayage scheduling from the Port of Los Angeles or Long Beach
  • +Delivery appointment with your receiving dock
  • +Optional third-party warehouse receiving count and split shipments to multiple sites

Not included

  • –Owning or operating warehouse space
  • –Storage, drayage and warehouse charges, which are billed by the provider or passed through at cost

You receive

Delivery appointment, proof of delivery and, if used, the warehouse receiving count.

Typical timing

Usually within the week after the container is available at the terminal.

What does it cost?

A fixed fee for the first sourcing project, then a commission of 5–8% of the order's FOB value. The rate is written on the quote before you place the order and is never added into the unit price.

Commission is calculated on FOB value, not on freight or insurance. Third-party costs are passed through at the amount invoiced, with no markup.

Item Fee

First sourcing project

Comparison of up to 5 factories plus one sample round. Credited in full against commission if you order within 6 months.

$950 flat

Orders under $15,000 FOB

8%

Orders $15,000–$40,000 FOB

6.5%

Orders over $40,000 FOB

5%

Minimum commission per order

$400

Third-party inspection, sample courier, freight, drayage

Inspection firms commonly bill about $268–$299 per man-day; a single-SKU order usually needs one.

At cost

Example: a $20,000 FOB order of drawer slides carries a $1,300 coordination fee. Duties, broker fees and freight are paid by you to those providers.

Which products do we cover?

Cabinet and interior hardware only. Staying in one category is how we know what to ask a hinge factory.

Pulls and knobs
Bar pulls, cup pulls, edge pulls and knobs in zinc alloy, stainless steel, aluminum or brass; matte black, brushed nickel, satin brass and other finishes.
Hinges
Concealed European hinges with 35 mm cups, full overlay, half overlay and inset, 105° and 110° openings, soft-close.
Drawer slides
Side-mount, undermount and center-mount; 3/4, full and over-travel extension; soft-close and push-to-open; zinc, black or white finishes.
Bath accessories
Towel bars, towel rings, robe hooks and toilet paper holders, in coordinated finish sets.

What we don't source

  • Fasteners, screws and anchors
  • Structural connectors and framing hardware
  • Electrical items, including lighted hardware
Ask about your part